At R Con Civil, we don’t just complete jobs—we deliver civil construction solutions that stand the test of time. From complex infrastructure and rural upgrades to major water supply contracts, our project experience spans the full spectrum of public and private sector civil works.
With every project, we bring hands-on expertise, a self-performed fleet, and a commitment to safety, timelines and lasting quality. Below are two recent case studies that demonstrate our ability to solve problems, deliver under pressure, and build long-term value for clients and communities.
CASE STUDY
Location: Yass, NSW
Duration: 3 weeks
Services: Earthworks, drainage upgrades, road construction
Equipment Used: Grader, roller, excavator, bobcat, truck & dog, water cart
Materials Used: Gravel, sand, concrete, geofabric, hydroseeding
A rural property owner in Yass, NSW needed a reliable access solution for a deteriorating private road. Seasonal water pooling, poor drainage, and failing surface materials caused ongoing access issues and safety concerns. The client required a fast, permanent road upgrade within a strict three-week timeframe.
R Con Civil conducted a detailed site inspection and identified key drainage failures and structural issues. We replaced substandard concrete pipes with engineered box culverts, regraded the road for proper water runoff, and rebuilt critical elevations to enhance long-term durability. A transparent scope of works and cost breakdown were delivered upfront, ensuring alignment with the client’s expectations.
Completed on time and within budget, the upgraded road now offers all-weather access year-round. The improved drainage and surface structure increased property safety and usability, and we continue to provide scheduled maintenance. This successful rural road construction project led to repeat work from the client.
CASE STUDY
Location: Snowy Mountains, NSW
Duration: 5+ years (ongoing)
Services: Potable water cartage, alpine logistics, remote access coordination
Fleet: Large-capacity potable water carts with 24/7 availability
Outcome: 100% delivery compliance; preferred supplier status
The Snowy 2.0 Hydroelectric Scheme required a consistent, long-term supply of potable water to remote alpine construction sites. The project faced complex challenges including extreme weather, remote access, steep terrain and changing site logistics. R Con Civil was chosen as the preferred civil contractor for water delivery.
We mobilised a large fleet of NSW-registered potable water carts, implementing a 24/7 delivery schedule that adapted to evolving construction zones and strict compliance requirements. Coordination with multiple site teams and continual route planning were crucial to ensuring uninterrupted water availability over the life of the project.
Over five years of continuous service, R Con Civil delivered 100% compliance with the client’s supply schedule. Our flexible approach and reliable fleet management contributed to the successful progress of Snowy 2.0, earning us contract extensions and long-standing trust.