R Con Civil delivers potable water by water cart to Canberra construction sites and remote infrastructure projects across NSW. The same carts that keep dust down on a Canberra earthworks job have supplied drinking-quality water to alpine construction sites on Snowy 2.0.
Civil and building sites use water every day the ground is open, and until permanent services are connected, most of it arrives by cart. We cart water to construction sites around Canberra for as long as a job needs it.
Our water carts already work on our own earthworks and road jobs, so the drivers are used to active sites with excavators and trucks moving around them. On any site, the carts follow the site rules and traffic plan like the rest of the plant.
A water cartage booking in Canberra starts with:
Tight sites and steep or soft access tracks can limit what a loaded cart can reach. Tell us about gates and turning space when booking, and we will plan a delivery point that works.
Snowy 2.0 is the clearest example of our remote work. The scheme needed a consistent supply of potable water to remote alpine construction sites in the Snowy Mountains, where snow and steep terrain make every delivery harder to plan.
We supplied that water with NSW-registered potable water carts. Route planning and coordination with multiple site teams kept water reaching each site as the construction zones shifted.
Before the first run on a remote job, we agree:
The same planning applies to regional NSW projects with little or no town water nearby.
Closer to Canberra, carts are often booked for dust suppression. Open ground and unsealed haul roads throw up dust as soon as they dry out, and a cart working through the day keeps the surface damp while the earthworks are under way.
Site water covers the other jobs a construction site needs water for before it has its own supply. Compaction is a common one, as fill and pavement layers need the right moisture before they are rolled.
Carts can work on site through the day or run regular deliveries to a site tank, with the schedule set around the job.
Tank filling keeps a site compound or remote facility supplied between deliveries. A full tank gives the site its own supply to draw on, and the cart tops it up on a set schedule.
For a tank fill, send the tank size, the location, how the cart gets access and how often the tank needs topping up. We match the delivery size and frequency to how fast the site uses the water.
Our NSW-registered potable water carts have supplied remote alpine construction sites on Snowy 2.0, with the routes planned around weather and moving work zones.
The carts run on our own earthworks and road jobs, so drivers know how to work around excavators, trucks and site traffic plans.
Our carts run from Hall, ACT, across Canberra and to remote and regional NSW projects. Regular NSW work areas include:
Call us on 0493 438 350 or send the site address, scope and timing through the form. We will come back to you on scope and price.
Procurement teams can also download our capability statement for an overview of the business.
Visit us:
Call us Today: